F20C
C2 : 250(11.0) / 307(13.2) / 250(11.0) IN
C2 : 250(11.0) / 297(12.7) / 250(11.0) EX
*On installing confirming that there is enough, valve to piston clearance, valve to valve clearance, cam lob to follower clearance during mid cam operation.
*The cam angles for Primary, Mid, Secondary are in..